NR-670A · Week 5 of 8 · The implementation plan

NR-670A Week 5 Implementation Plan: How to Write It

The short answer

NR-670A now asks you to turn a supported idea into a plan someone other than you could carry out. The written test of an implementation plan is simple and unforgiving: could a competent colleague read it and know what changes on Tuesday morning, who has to agree first, in what order the steps happen, and how a small version would be tried before anything spreads. Your section may print this as NR 670A or NR670A; it is the same course. Chamberlain publishes no syllabi outside Canvas. The placement here is our teaching judgment from the course's catalog arc; your section's rubric decides what your week actually asks.

NR 670A Week 5 grading scale at Chamberlain, the criterion levels this assessment is scored on, from Chamberlain Tutors
How Chamberlain grades NR 670A Week 5, visualized by Chamberlain Tutors.

What a plan has to make possible for someone who is not you

In a long-term care facility, a nurse leader working on post-fall documentation drafted a revised huddle record and then did the thing that separates a plan from a proposal: she asked two charge nurses on one wing to complete it for three days. On the second day it emerged that one required field asked for information that would not be known until the physician callback, which typically happened after the huddle ended. Three days of paper testing rewrote her sequencing and saved her from proposing something that could not have been completed as designed. The written plan she submitted was better because it had already met reality once.

The purpose of this stage is to demonstrate that you can convert evidence into operational instruction. Every earlier stage was analytic. This one is procedural, and it is scored on specificity: the change described as a behavior rather than a concept, the approvals named as roles, the sequence written with dependencies visible, a small test defined before any spread, and a mechanism that keeps the change alive after your practicum ends. Vague plans are the most common failure at this point, and they fail in a predictable way: they describe an intention to improve something, and a reader finishes them without knowing what anyone would do differently.

A framework belongs here, applied rather than mentioned. Naming a recognized change or improvement model and then walking your work through its stages, with content in each one, is what converts your plan from a personal scheme into professional practice. The failure mode is the framework that appears once in a sentence and never again. If you name a model, every stage of it should have your specific content underneath it, and any stage you cannot fill concretely is telling you something real about a part of the plan you have not thought through yet.

The practicum boundary stands, and it is at its most important here because a plan describes real activity. Your 144 hours, the hour log, activity counts, site paperwork and the mentor evaluation are your own record of work you personally performed, and none of it is drafted, reconstructed or estimated with help. Whether the change is actually piloted at your site is determined by your mentor, your organization and your permissions, never by what a paper would prefer to report, and nothing that did not happen is ever written as though it did. What the written layer supports is the plan as an academic document: how to state a change behaviorally, how to sequence work with dependencies, and how to write a sustainability mechanism that does not depend on your continued presence. Any real person or case appearing in the plan is de-identified first: roles rather than names, and no dated incidents.

The NR-670A Week 5 method, step by step

Six moves that turn an evidence-supported idea into an executable written plan.

  1. Write the change as a difference in what someone does

    Not improved communication but: at the point of handoff, the sending nurse completes four named fields and the receiving nurse confirms them before the transfer is accepted. If your change cannot be written as an observable behavior at a stated moment, it is still a value and not yet a plan.

  2. Apply a change framework stage by stage with real content

    Choose a recognized model, cite it with its source and year, and put your specific work under each stage. Empty stages are diagnostic. A model whose readiness stage you cannot populate is telling you that you have not established readiness, and that is worth discovering now rather than in the closing paper.

  3. Map stakeholders by influence and by what the change costs them

    For each group, name what they gain, what it takes from them in time or autonomy, and what would make them resist. Resistance analyzed as a rational response to a real cost is leadership writing; resistance described as an attitude problem is not, and rubrics distinguish the two reliably.

  4. Sequence the work so the dependencies are visible

    Nothing is built before it is approved, tested before it is built, or spread before it is tested. Write what must be complete before each step can begin and who owns it by role. A plan whose steps could occur in any order has not been sequenced, it has been listed.

  5. Design a small test rather than a launch

    One shift, one wing, a handful of episodes. State exactly what you would watch during it and what result would send you back to redesign. A small test written into the plan is the clearest evidence available that you understand improvement work rather than project announcements.

  6. Build the sustainability mechanism into the plan itself

    Name who audits the behavior after you leave, at what interval, against what definition, and who receives the result. Sustainability is not a closing paragraph of hope. It is an owner, a schedule and a report route, and writing those three is what stops a capstone from describing a change that lasted as long as the student did.

A layout and word budget for an implementation plan

The frame our tutors keep beside an implementation submission of roughly 1,400 to 1,800 words. It is our own outline rather than anything the university issues, and your section's rubric outranks it wherever the two disagree. Scale proportionally if your assigned length differs.

SectionWhat belongs in itWord target
The change as behaviorWhat a named role does differently, at what moment in the process, described so an observer could confirm it happened.140 to 180
Framework, appliedThe chosen model cited with source and year, each stage carrying your specific content rather than a definition.280 to 340
Stakeholders and real costsEach group with what it gains, what it gives up, and the resistance that follows from that cost.220 to 270
Sequence and dependenciesSteps in order with the owner by role and the prerequisite that must be complete before each begins.230 to 280
Resources and the small testWhat the change consumes, and the defined trial: scope, duration, what you watch, and what result triggers redesign.230 to 280
SustainabilityThe owner after you leave, the audit interval, the definition audited against, and where the result is reported.170 to 210

Evidence craft for change planning

Cite the framework properly and then use it. Name the model, its originator and its year in the sentence where you introduce it, then let its structure carry your headings. A framework cited and abandoned is worse than none, because it advertises an intention the document then fails to meet.

Trace each design decision back to the synthesis. When you choose an intervention component, say which finding supported it. When you leave one out that the evidence supported, say why your setting cannot carry it. That second sentence is where the conditions paragraph from the previous stage earns its keep, and graders read it as applied judgment.

State resistance in the objector's own terms. An objection you have paraphrased is easy to defeat on paper and useless in a real building. Write the strongest version of what the resisting group would actually say, then answer it. This costs you nothing and is one of the most reliable ways to lift a plan into the top scoring band.

Never write a completed action that was not completed. Was presented to and adopted by are claims about events. Write will be proposed to, or is scheduled for review by, unless it genuinely happened. Tense discipline here is an integrity matter first and a scoring matter second, and the closing paper depends on it being right.

Let the evidence win when the evidence should win. Where your plan departs from what the literature supports because of a local constraint, say so explicitly and name the constraint. A documented, reasoned departure is a graduate move. A silent one looks like the synthesis was never read.

Five mistakes that cost points in this week's territory

  • A change described as a value. Enhance collaboration cannot be observed, so nothing in the evaluation stage can be measured against it.
  • A framework named once and dropped. The reader sees the citation, then sees no stage of the model in the structure, and scores the row accordingly.
  • Resistance treated as an attitude. Staff buy-in as a category, with no analysis of what the change actually costs anyone, reads as inexperience.
  • Straight to full rollout. A plan with no small test tells a reader you have not run improvement work before, whatever the plan itself proposes.
  • Sustainability written as hope. Ongoing monitoring will continue, with no owner, no interval and no definition, is the single most common empty paragraph in capstone plans.

Before you submit

  • The change is written as an observable behavior at a stated moment
  • Every stage of the named framework carries your own content
  • Each stakeholder group has a stated cost, not just a stated interest
  • Steps appear in order with owners by role and prerequisites visible
  • A small test is defined with scope, duration and a redesign trigger
  • Sustainability names an owner, an interval and a definition
  • Nothing is written in a completed tense that has not been completed

Designing the NR-670A change plan?

Send the rubric and your synthesis out of Canvas. A premium original draft comes back in 24 to 48 hours with the change stated behaviorally and the framework carried through every stage, and revisions run until the grade lands.

Questions students ask about this stage

Nothing will actually be implemented before my practicum ends. Is the plan still worth writing properly?
Yes, and it is worth writing exactly as carefully as if it would run tomorrow, because the plan is the graded artifact regardless of whether the organization acts. Most capstone plans at this level are proposals, and rubrics are built for that. What you must do is keep the tense honest throughout: the change is proposed, the pilot is designed, the approval is sought. Then add a short paragraph saying what would happen next and who would decide, which converts an unimplemented plan from a loose end into a documented handoff. What sinks students here is not the absence of implementation, it is writing an unimplemented plan in the past tense and then having to walk it back in the closing paper.
How do I write honestly about resistance from someone I report to?
Write about the position, never the person, and give the position its strongest form. A manager protecting throughput during a staffing shortage is not obstructive, they are managing a real constraint your plan happens to add to. Describe that constraint accurately, quantify what your change costs in minutes per episode if you can, and then answer it with the sequencing or the pilot scope that reduces the cost. Nothing in the paper should identify the individual, and nothing should read as a grievance. Handled this way the paragraph becomes evidence of exactly the competency the course is assessing, and it also produces a document you could safely leave on a desk in the building where you work.
My mentor prefers a different approach than the evidence points to. How do I write that?
Write both, and make the disagreement productive rather than hidden. State what the synthesis supports, state the alternative your mentor favors and the local reasoning behind it, and then say which you are planning and why. Often the honest answer is that the mentor's version is what the setting can actually absorb, and that is a legitimate implementation condition rather than a failure of evidence-based practice. Where you follow the local preference, say plainly that it departs from the published direction and name what you would monitor because of that departure. A reader who sees the tension acknowledged and resolved with reasoning will score it far higher than a plan that quietly follows the mentor while citing literature that recommends something else.

Keep going

Online now